|
Post by arcticcatmatt on Mar 14, 2010 10:44:47 GMT -5
When is the trail work day to help take down signs and stuff? I know that is coming up here very soon. Also, wondering if there has been talk of putting a bridge down here behind the VFW if if there has been what can people do to help build it. What happened to the bridge that is behind the VFW? That has a repair in the center and the other boards felt soft while riding over them. Do they need to be replaced? Looking forward to helping with things this season and hoping to talk some others into getting involved.
|
|
|
Post by rj on Mar 15, 2010 11:19:46 GMT -5
Talk to the trail boss for your area. If the temps forecasted for the next week are any indication, we will be taking signs down soon (they will be coming down anyway after 4/1). I will be starting on signs in my area soon (as in this week probably).
|
|
|
Post by arcticcatmatt on Mar 15, 2010 20:02:54 GMT -5
^ Gotcha RJ. I will email Dan and see what is required of this area but I know other areas need help also. Do you know anything about the area in the above picture? Has the question been raised before? I am willing to help with the construction of bridges and such along with take signs down/clear trails.
You got helpers in Groton to give you a hand? Might be able to drum up some guys on here as some live in Dryden/Groton and ride those trails all the time.
|
|
|
Post by rj on Mar 16, 2010 10:48:22 GMT -5
Well, I do have some planks that need to be put down on the bridges so that the groomer does not get cleats caught in the ties and break them off. I have to go and measure the idler spacing (width) for placement so that the tracks will ride on them right.
|
|
|
Post by mach1martysr on Mar 27, 2010 20:53:52 GMT -5
RJ, The Ridge Runners took down the signs today 3/27/10.
|
|
|
Post by rj on Mar 28, 2010 19:25:06 GMT -5
Going out tomorrow and get the rest,
|
|
|
Post by rj on Mar 29, 2010 15:05:46 GMT -5
Got them all in today.
|
|